From source,
to ultrapure.
A resistivity of 18.2 MΩ·cm for semiconductor process water cannot be reached with any single unit. Pretreatment (UF) → 1·2-Pass RO → EDI → MBP polishing must be designed together, stage by stage, with the optimal membranes and operating conditions.
Backed by numerous references in semiconductor, power and bio, MEERAE delivers a turnkey package matched to your raw-water quality.
Tell us your target resistivity, TOC and capacity, and we will submit
the optimal package, footprint and a proposal.