




Wastewater treatment facility installation project for Seoheung Capsule’s Osong plant, covering sedimentation, chemical dosing, aeration, oil separation, sludge dewatering, odor control, and control systems.
Installation of a wastewater treatment facility for Seoheung Capsule’s Osong plant. The system was configured with primary and secondary sedimentation tanks, chemical tanks and dosing pumps, raw water and internal circulation pumps, mixing and aeration blowers, oil skimmer and oil separator, automatic bar screens, belt press dehydrator, sludge hopper, and MMI/PLC control system.