




Turnkey engineering, procurement, and construction of a 10 m³/hr Demineralized Water System, a 35 m³/hr DH Polish System, Chemical Dosing, and a 30 m³/hr Wastewater Transfer System.
A comprehensive water utility and wastewater management project implemented for the operational reliability of the Gwangju-Jeonnam Joint Innovation City district heating plant. The integrated system features a high-performance demineralized water production train optimized with Activated Carbon Filters, Cation/Anion Exchangers, and a Degasifier . It concurrently houses a customized District Heating water polishing line consisting of automated Pre-filters and Mixed Bed Polishers to ensure strict cycle chemistry control. Additionally, the turnkey delivery successfully incorporated specialized Sample Cooler Racks for process monitoring, multi-chemical dosing units, and a dedicated Wastewater Transfer Package configured with a Corrugated Plate Interceptor (CPI) Oil Separator and automated sump pumps designed to meet rigorous plant emission standards.